Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: A problem that needs to be fixed |
Tags: | None |
Date time: | 11.29am, Wednesday 4th September, 2013 |
Time line: | Earlier | Later |
Facing: | South |
Added by: | andypreece |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Bebington |
It looks like more effort has been put into the grass than the path
Comments reflect the views of the original submitter only.